Since early 2012 I have been making regular trips to a remote location in Southwestern Oklahoma to witness the birth of a new wind farm. In fact, a farm in which I have an interest was one of the lucky few who was selected by a study as a location for the new Rocky Ridge Wind Farm, and two turbines were to be constructed on our land.
The process from study, to leasing the land, to the actual construction of the turbines has been a three year process. This week marked the day when our two turbines were erected.